news banner
Company news

Comprehensive Guidelines for Precise Film Installation Process

2024-05-16

Comprehensive Guidelines for Precise Film Installation Process: Detailed Steps and Instructions for Seamless Operation and Continuous Film Fitting


 Processed film fitting1715844870865426.png

1. Turn off the switch of operation when installing film.

2.When the machines reached at destination, any operation or film installation may as well to do at assistance by our engineer, and give your full cooperation please.

A) Put film roller on the right position between the two supporting rollers.

 Position: the right position must be followed the guidance on the rollers (1/2 of the height of two triangular board).

B) Pull the handhold of perforator down about 90 degree.

C) Pull down the shrink film according to the drawing at following through each roller. D)After film has been passed the sixth roller, return the handhold of perforator back.

E) Through the sixth roller, pull out a length film in about 1 foot and get it through both the conveying parts and triangular board to finish the film installation.


To install the film continuous according to the following drawing.

A)Spreading film at the front of triangular board.

B)To fold film by counter, the inside of film become outside. Let the top of film face to the direction of conveyor belt.

C)Using your left hand to press the film unmovable, pull the corner which formed by film folded on these two triangular board.

D)After the film already pulled on the both of triangular boards, pull out a length of film and clamped it in the conveying chain.

1715844712885200.png