WIN-WIN PACK shrink wrapping machine installation and maintenance guide
2024-05-18
1. Machine Installation
A. Open the top cover of packaging box, and remove the four side plates of packaging box;
B. Carry out the machine body, and place it on the stable ground;
C. Adjust the foot bolts at the bottom of the machine in order to regulate the machine height and prevent it from sliding when the machine is in operation;
D. Please connect the power cord according to the voltage shown in nameplate and link with air supply. Note: Make sure it is connected with ground wire.
2.Machine Maintain
A. After finished the work, please remove the residue and dust from the machine;
B. Please check sliding parts and running parts regularly and add lubricating oil on the parts;
C. Please remove the carbon deposit on the sealing cutter regularly, and note that do not use metal parts to remove it;
D. The overall performance inspection shall be conducted once a month.